CONCRETE PRODUCTS | PIPE | ENGINEERING CAPABILITY
Sales phone 131 004
Home
Products
Downloads
Projects
News
About
Contact Us
OSD
On-Site Detention Systems
Plastream Detention Systems
Flow Control
Hydro Brake®
Water Level Controller
Oil-Water Separation
ecoSep®
ecoTop®
Rainwater Utilisation
ecoRain®
ecoRainPlus®
Gross Pollutant Traps
CDS® Units
CleansAll®
X-Wave Screen
P.A.D.
Accessories
Filtration
Filternator®
Up-Flo™ Filter
envissSentinel™
Oil Spill Control
ecoStop®
Separation
Downstream Defender®
On-Site Treatment
First Defense® Vortex Separator
Plastic Slotted Pipe
Plastream Slotted Pipe
Pipe
Concrete Pipe
Plastic Pipe
Sewer Pipe Systems
Naylor Densleeve
Naylor Denseal
Naylor Denlok® Jacking Pipe
Naylor Flexible Couplings
Chemical Drainage
Hathernware Thermochemical Resistant Pipe
Denchem Thermochemical Resistant Jacking Pipe
Bridges & Earth Retention
PermaTrak® Modular Boardwalk
M-Lock® Precast Bridge
MassBloc® Instant Wall
A-Jacks® Concrete Armour
Pits, Shafts & Access Systems
Stormwater Pits (CPO)
Stormwater Pits (RKO)
Kerb Inlets
Headwalls
Sewer Access System
Vertical Segmental Shafts
Sewer Pump Station
Irrigation & Rural
Stock Grids
Stock Troughs
Poles, Piles & Columns
Communication Poles
Lighting and CCTV Poles
Power Poles
Foundation Piles
Marine Piles
Building Columns
Home
>
News
News
Displaying 1 - 6 of 40 News Item(s)
Single lift, shaped culverts create new
culvert
(15 May 2013) The versatility of Plastream steel reinforced composite pipes has been proven once again. Creation of a new culvert crossing as part of the Kellerberrin-Bencubbin Road Realignment utilised the unique benefits offered by Plastream pipe including made to order 15.8m length >
End-to-End Wall Solution at Daunia
Mine
(3 Aug 2012) Manufacture of the panels was undertaken at Rocla’s Mackay factory. As well as supplying the walling products, Atlantic Civil Products’ specialist engineering team provided critical design advice and conducted initial site training to ensure a successful >
Simplifying Segmental
Shafts
(3 Aug 2012) Microtunnelling, jacking pipe, drilling and infrastructure contractors across Australia now have local access to a quick, cost effective, easy-to-install alternative system for building segmental vertical shafts. With sizes ranging from 4.5m to 30m, it is suited to a >
Righting a Rocky
Road
(3 Aug 2012) When a major slip closed the Snowy Mountains Highway at Brown Mountain in early March, New South Wales’ Roads & Maritime Services team turned to Rocla to provide MassBloc® products to shore up the highway and make it safe to re-open. The slip had taken out >
Hydro-Brake® is Best
Solution
(3 Aug 2012) The only product of its kind on the market, Rocla’s Hydro-Brake® was chosen by MWH as a flood attenuation mechanism on the Jindalee Park’n’Ride project for Department of Main Roads in Queensland. The Hydro-Brake® is an innovative Rocla >
More Constructive
Growth
(3 Aug 2012) Ever eager to offer greater value to its clients, Rocla has added another highly regarded infrastructure products manufacturer to its ranks. Australian Construction Products (ACP) was integrated with Rocla in March, after a strategic review of the ACP business indicated that >
1
2
3
4
5
6
7
Next
Projects
Rocla helps to prevent disaster during Bundaberg Floods >
A Faster, Simpler Bridge Solution >
Flexible Product on the Right Track >
ACP Appointed Exclusive Distributor for BSI >
view more
Latest Rocla Works
Download a brochure
Find a location/contact